C7 Building at Bhiwandi, India.
Project Details :
Client :
Blazo Clothing Ltd.
Architect :
Design Culture, Mumbai.
Duration :
2020 – 2021
Services Provided by D.R.BELLARE :
MEP – Building Services Engineering which includes HVAC,
Electrical & L.V, Security system, Plumbing & Fire Fighting System.

Project Area
50,000 /- Sq.ft. with Industrial Building configuration of Ground, First & Second Floor & terrace.
Textile Giant BLAZO CLOTHING LTD has already set up two numbers building along with D.R.BELLARE TEAM with state of art manufacturing facility. C7 is new extension building has been planned looking at export opportunity & current Indian market.
D.R.BELLARE has been appointed to convert this extension building into another state of art building with modern services in given time line with below scope.
Energy Efficient HVAC with VRV system.
Evaporative Cooling system for factory area
100% DG back up.
IT & Electrical infrastructure network with in Building.
Energy Efficient lighting, sensors, etc.
Fire detection & alarm system.
IP based CCTV System.
Emergency Evacuation system.
Emergency lighting system.
Power distribution for machinaries.
Lightning Protection system.
Public health Engineering / plumbing system.